Introduction
|
|
|
|
" AN HYDRO ELECTRIC GENERATING
COMPANY OF U.P. GOVERNMENT "
|
|
|
|
MAIN ACTIVITIES
|
|
•
|
To establish operate and maintain Hydro Electric Power Stations along with associated
sub-stations and transmission lines.
|
|
•
|
Sale of electricity generated to UPPCL
|
|
•
|
Survey, Investigation and Preparation of DPR for new Hydro Electric Projects.
|
|
•
|
Renovation & Modernisation of running projects.
|
|
•
|
Development of Hydro Electric Power Projects in the state in line with the policy
of State Govt.
|
|
|
|
|
|
|
TOTAL INSTALLED CAPACITY
|
526.7 MW
|
|
TOTAL ANNUAL ENERGY TARGET IN MU
|
1311.00
|
|
|
GENERATING HYDRO ELECTRIC POWER STATIONS
|
|
Rihand
|
300 MW
|
|
Obra
|
99 MW
|
|
Matatila
|
30.6 MW
|
|
Khara
|
72 MW
|
|
Upper Ganga Canal Stations |
15.5 MW
|
|
Belka
|
3.0 MW
|
|
Babail
|
3.0 MW
|
|
Sheetla
|
3.6 MW
|
|
TOTAL
|
526.7 MW
|
|
GENERATED POWER BEING SUPPLIED TO -- U.P. Power Corporation Ltd.
|
|
|
|
|
RESTRUCTURING / REORGANISATION
|
|
|
|
Reforms of power sector in state and disbanding of UPSEB on 14.1.2000 effected restructuring/
reorganization of UPJVNL.
&
All Hydro Electric projects under erstwhile UPSEB transferred to this Nigam and
its structure and scope widened beyond the limits of SHP to cover all sizes of Hydro
Elexctric Projects under its wings with the following installed capacity:
|
|
|
|
Reforms of power sector in state and disbanding of UPSEB on 14.1.2000 effected restructuring/
reorganization of UPJVNL.
&
All Hydro Electric projects under erstwhile UPSEB transferred to this Nigam and
its structure and scope widened beyond the limits of SHP to cover all sizes of Hydro
Elexctric Projects under its wings with the following installed capacity:
|
|
|
|
Large and Medium Projects
|
1469.55 MW
|
|
Projects on U.G.C
|
26.60 MW
|
|
SHPs
|
26.43 MW
|
|
Total Installed Capacity
|
1522.58 MW
|
|
|
|
|
|
|
|